Swimming pools & spas
Steel-reinforced concrete built to engineers’ drawings, in any shape your yard allows. Fully tiled, Silkstone or pebble interiors, with split levels, swim-outs, islands and waterfalls.
Explore pools
Bespoke concrete pools, spas and landscapes, designed and built for Victorian families for more than fifty years.
Since 1972
We shape
concrete, steel and stone into backyards
where Victorian families
slow down. Any shape, any size, built by one licensed team
from the first sketch to the first swim.
What we do
Four services, one team. Whatever you’re planning, we design it and build it, start to finish.

Steel-reinforced concrete built to engineers’ drawings, in any shape your yard allows. Fully tiled, Silkstone or pebble interiors, with split levels, swim-outs, islands and waterfalls.
Explore pools
New interiors, paving and coping, shortening a pool or converting it to a swim spa or water tank. Or fill it in and reclaim the yard.
See renovations
With our partners at Earth Aspects: natural stone, paving, water features, garden beds, retaining walls, compliant glass fencing and rainwater tanks.
Plan the whole yard
Seamless wet-pour rubber that cushions falls, drains after rain and stays slip resistant underfoot. Ideal for play areas, pool surrounds, paths and garden spaces.
Explore softfallThe process
Around 4–6 weeks to permit. Excavation within two weeks of approval, and your shell complete in roughly 7–10 days.
Start step oneNominate your location. We assess the site and design a solution that fits your needs.
Provide a copy of your Certificate of Title, a block plan showing existing buildings, a water board plan showing mains and easements, and a soil test.
We supply structural engineers’ drawings along with your Home Owners Warranty Insurance application.
Lodgement and approval of your building permit. Up to this point the timeline is roughly 4–6 weeks.
Excavation within two weeks of receiving your permit, then steel, plumbing and sprayed concrete. About 7–10 days to a finished shell.
Installation and plumbing of your equipment, solar heating, waterline tiling, coping and landscaping.
Compliant fencing must be in place before the pool can be filled.
We arrange and obtain the building inspection for you.
A final finish and clean, followed by filling your pool.
We walk you through your equipment, the maintenance schedule and how to keep your pool water healthy.
It’s our mission to build a pool to fulfil your vision by listening to your needs.
Your build is carried out by a licensed builder and an experienced team.
Industry-standard contracts that set out every stage clearly.
Home Owners Warranty Insurance arranged for your build.
Design, permits, build and landscaping, all with us.
Contract, engineering and permit usually take about 4–6 weeks. Excavation starts within two weeks of the permit, and the concrete shell is finished in roughly 7–10 days. Equipment, tiling, coping, fencing and inspection follow before we fill it.
Your Certificate of Title, a block plan showing existing buildings, a water board plan showing mains and easements, and a soil test.
Yes. By law every pool and spa must be fully fenced to Australian Standards, and the fence must be in place before the pool is filled. We supply compliant glass, timber or metal fencing.
Yes. We refresh interiors, replace paving and coping, shorten pools or convert them to swim spas or water tanks. Or we break the pool up and fill it with clean fill or packing sand, ready for paving or building.